Our process, in practice

What an inspection
must cover

"Third-party inspection" stays abstract until you see what is actually checked. This is the requirement list we hand to the independent inspection agency before any decorative lighting order leaves the factory. Adapted per project, never skipped.

1. Quantities and references

  • Piece count per reference against the order
  • Random sampling per recognised statistical standard (AQL), not cherry-picked cartons

2. Workmanship against the approved sample

  • Finish, colour and texture compared to the validated physical sample, not to a photo
  • Surface defects: scratches, bubbles, cracks, uneven coating, visible glue
  • Weld and joint quality on structural parts

3. Dimensions and weight

  • Key dimensions against the written specification, with stated tolerances
  • Piece weight where structural anchoring depends on it

4. Electrical safety points

  • Socket type and wiring standard as specified (E27/E26, hardwired, driver class)
  • Insulation and earth continuity checks, function test on powered samples
  • Marking and labelling required for the destination market

5. Packaging and transit readiness

  • Export packaging as specified: cushioning, separators, carton strength
  • Drop-test on sampled cartons for fragile materials (glass, stone, resin)
  • Carton markings: reference, quantity, handling instructions

What happens with the report

The agency issues its report with photographs. You receive it as it is, before shipment: pass, fail, or pass with reservations. A failed inspection blocks the balance payment until defects are corrected and re-inspected. That is what staged payments are for.

In short

Before shipment, an independent agency checks quantities, workmanship against the approved sample, dimensions, electrical safety points and export packaging, and issues a report with photographs shared with the client unedited. A supplier who refuses this inspection is not a Maison Loucelle supplier.